Electrical power and the building permit exemption for backyard pods

Electrical power is addressed in 10 of the 15 permit exemptions here. Los Angeles, San Jose, Citrus Heights and Sacramento County exempt only buildings with no electrical work. Denver allows two lights and two receptacles with an electrical permit.

City or countyElectrical power in the published ruleSource
SeattleThe exemption conditions do not list wiring. Seattle City Light takes applications for new or changed electrical service.Seattle Department of Construction and Inspections
PortlandElectrical, plumbing, or heating and cooling work needs trade permits.Portland Permitting & Development
Washington CountyNot listed.Washington County Land Use & Transportation
DenverA maximum of two lights and two receptacles are permitted with a valid electrical permit.Denver Community Planning and Development
AustinNew wiring is not on the exempt list for residential electrical work (the list covers items such as cord-and-plug decorative lighting and like-for-like replacements).Austin Development Services Department
PhoenixCity commentary: “If utilities are provided to a detached accessory structure exempt from permit, a permit is required for the installation of the utilities.”City of Phoenix Planning and Development
Los AngelesExemption requires that the structure “does not contain any heating, plumbing or electrical installation”.Los Angeles Municipal Code
San JoseNo permit “unless it includes electricity or plumbing”.City of San Jose Development Services Permit Center
San FranciscoLights or outlets are allowed if an electrical permit is obtained and the work is inspected and approved.San Francisco Department of Building Inspection
OaklandA permit is needed if mechanical, electrical or plumbing work is involved.City of Oakland Planning and Building
San Mateo (city)Not listed.City of San Mateo Building Division
San Mateo County (unincorporated)Not listed.San Mateo County Planning and Building
Citrus HeightsExemption requires that “no power will be ran to the building”.City of Citrus Heights Building and Safety
Sacramento County (unincorporated)Electrical or plumbing added to an exempt structure requires a miscellaneous permit.Sacramento County Building Permits and Inspection
RaleighNot listed.City of Raleigh

Power on pods as shipped


Solar power

Autonomous offers solar on the WorkPod with 3 x 430 W panels and on the StudioPod with 4 x 460 W panels. Each solar option has a 10.2 kWh battery and a 3,000 W inverter limit. None of the 15 rules here covers solar on an exempt shed. The building department for the address decides whether a solar setup needs a permit.

The building department for the address decides whether a permit is required. This site repeats published rules and compares them with published pod sizes. Zoning rules, HOA rules and setbacks can also apply.